Hawley

Rural compression facility tying mid-stream natural gas into a major transmission line. Site utilizes Steel Nation’s phase 2 sound mitigation system. Ventilation in the compressor and auxiliary buildings use a pull system, with full HVAC incorporated into the MCC building.

6 Total buildings including:

  • (1) compressor building hosting (3) Cat 3612’s, has a 15-ton bridge crane
  • (1) auxiliary building hosting back-up generator
  • (1) MCC/office building for compressor technicians and controls
  • (3) canopies covering de-hy and processing equipment